Cart

Quảng Ninh Garage Project - Comprehensive Solution with Hà Phong Equipment

09/12/2024
PROJECT

Quảng Ninh, one of the most dynamically developing provinces in northern Vietnam, is witnessing a significant increase in demand for car repair and maintenance services, especially with the growing number of vehicles. To meet this demand, the Quảng Ninh Garage Project was established with the mission to provide high-quality services supported by modern equipment supplied by Hà Phong Investment and Trading Joint Stock Company.


Road System in Quảng Ninh:

  1. National Highways: The road system consists of seven national highways with a total length of 558.79 km:

    • National Highway 18A: Spanning 240 km in the province. Starting at Vàng Chua Bridge, Đông Triều Town, and ending at Bắc Luân I Bridge, Móng Cái City.
    • National Highway 18B: 16.9 km long. Starting at Quảng Đức Junction, Hải Hà District, and ending at Bắc Phong Sinh Border Gate, Hải Hà District.
    • National Highway 18C: 121.14 km long. Starting in Tiên Yên Town, Tiên Yên District, and ending at Hoành Mô Border Gate, Bình Liêu District.
    • National Highway 10: 6.5 km long. Starting in Thanh Sơn Ward, Uông Bí City, and ending in Phương Nam Ward, Uông Bí City.
    • National Highway 4: 37 km long. Starting in Điền Xá Commune, Tiên Yên District, and ending at Mũi Chùa Port, Tiên Lãng Commune, Tiên Yên District.
    • National Highway 279: 62.55 km long. Starting in Quang Hanh Ward, Cẩm Phả City, and ending in Tân Dân Commune, Hoành Bồ District.
    • National Highway 17B: 1.34 km long. Starting in Mạo Khê Ward, Đông Triều Town, and ending at Đá Vách Bridge, Mạo Khê Ward, Đông Triều Town.
  2. Provincial Roads: 16 routes with a total length of 409.93 km.

  3. Highways: Three major highways:

    • Hạ Long - Hải Phòng Expressway: 25 km. Construction began in 2014 and completed in 2018. Connects Hà Nội - Hải Phòng Expressway in Hải Phòng to the Hạ Long - Vân Đồn Expressway at Minh Khai Interchange, Hạ Long City.
    • Hạ Long - Vân Đồn Expressway: 60 km. Construction began in 2015 and completed in 2018. Connects Hạ Long - Hải Phòng Expressway at Minh Khai Interchange, Hạ Long City, to the main road of Vân Đồn Economic Zone.
    • Vân Đồn - Móng Cái Expressway: Officially started in April 2019 and inaugurated on September 1, 2022. The 80 km highway is divided into two independent projects: Vân Đồn - Tiên Yên (16 km) and Tiên Yên - Móng Cái (64 km).
  4. Bus Stations and Passenger Transport Routes: There are currently 16 bus stations in operation. However, Đầm Hà, Ba Chẽ, and Cô Tô districts do not have any bus stations. Most stations meet basic needs but lack space for expansion and are not aligned with urban planning.

Garage in Quảng Ninh:

With years of experience in garage equipment supply, Hà Phong not only provides advanced technological solutions but also offers detailed consultancy on space design, system installation, technical training, and marketing for staff. These solid foundations make the Quảng Ninh Garage Project a trusted destination for customers, ensuring operational efficiency and optimal investment costs.

0.0           0 reviews
0% | 0
0% | 0
0% | 0
0% | 0
0% | 0
Quảng Ninh Garage Project - Comprehensive Solution with Hà Phong Equipment

Cám ơn bạn đã gửi đánh giá cho chúng tôi! Đánh giá của bạn sẻ giúp chúng tôi cải thiện chất lượng dịch vụ hơn nữa.

Send actual photo

Only accept JPEG, JPG, PNG. Capacity not more than 2Mb per image

ĐÁNH GIÁ SẢN PHẨM

  • Filter:
  • All
  • 1
  • 2
  • 3
  • 4
  • 5
Share

Related post

ĐẶT LỊCH